HPCL Hesheng Polymer Alloy Plastic Cable ladder(PVC)

Cable ladder is one of the most widely used in industrial and civil buildings. It has the advantages of light weight, large load, beautiful appearance, simple structure and convenient installation. It is suitable for both the installation of strong electric cable of small diameter and the laying of weak electric cable. In the project, there are two ways of laying the tray with or without a cover. The tray without a cover has good heat dissipation performance, but it is easy to fall dust, and troublesome to clean. It is usually used in dust-free or less dust places, otherwise the tray with a cover should be used. Tray selection principles are as follows: A: Tray can be used for wiring of ordinary power cables and communication cables, but tray without covers are not allowed to be laid in the ceiling or hanging ceiling; B; 750°C, 1.5 h refractory cable can be wired with covered tray, (the tray shell should be made of fire prevention materials.)

Products Details

hc
Packing Method: 1.In bundle 2.Wrapping Film,plastic tape, Plywood pallet. 3.Plywood Pallets is optional for wire basket cable tray 4.Carton for accessories 5.As per requirements
application
certificate
Overview of PHQ- high strength whisker modified plastic cable supporting system
specification
hc
detail
size
★ The polymer alloy cable tray developed by Hesheng. according to the ul568 standard of the United States, adopts double hollow structure design and ASA double-layer co extrusion process. According to the mechanical structure principle, the double-layer hollow structure can reduce the dead weight of the product, strengthen the bearing capacity, and play a good heat dissipation effect. The application of ASA double-layer co extrusion process greatly improves the product anti-aging Chemical, anti ultraviolet performance, prolong the service life of the product, at the same time by special technology made of matte surface, more solid and wear-resistant. The product has passed the national quality supervision and Inspection Center for electric control and distribution equipment. It has the advantages of high strength, corrosion resistance, anti-aging, light weight, strong flame retardant, insulation, water resistance, easy installation, long service life, green environmental protection and many other advantages. It is a product of upgrading the conventional cable tray, and can completely realize "replacing steel with plastic". ★ Cable ladder is one of the most widely used in industrial and civil buildings. It has the advantages of light weight, large load, beautiful appearance, simple structure and convenient installation. It is suitable for both the installation of strong electric cable of small diameter and the laying of weak electric cable. In the project, there are two ways of laying the tray with or without a cover. The tray without a cover has good heat dissipation performance, but it is easy to fall dust, and troublesome to clean. It is usually used in dust-free or less dust places, otherwise the tray with a cover should be used.
different
system
system
why
Q: Are you a factory or a trading company? A:We not only have our own factories but also have shares in some other enterprises. Q:What services you can offer? A:We are manufacturer with a range of electrical and network cable tray systems , you can enjoy the one-stop shopping service from our company.Quality and cost driving manufacturer with ISO9001,CE,NEMA,UL,SGS certificated to provide customers reliable products with most competitive price. Q:How can you make commitment passing the test? A:We have professional lab to do below test: a.safe loading test b.galvanized thickness test c.salt spray test d.electrical continuity Q:What is your products advantages: A: a.Reduce installation costs and time b.Easy for changing, adding and moving c.Bright surface means good material and quality d.Our electrical and network cabling equipment have the same quality as the international famous brand. Q: Can you provide samples? A: Yes ,you can get the free samples. Q: What is your payment terms? A: 30% T/T deposit,balance will be paid before shipment or against the copy of B/L; Q: How about the delivery time? A: According to your order list and quantity,Normally delivery in 15-25days. Q: Why do choose us? A: Cable Tray Official Certificates Worldwide We has been certified by ISO9001 in China, UL in U.S.A and CE in E.U. with professional design and extremely well production techniques. These certifications are our first step into the International market. Cable Tray Production Flow Strictly Managed Our Factory has various types of CNC machines, high quality modeling machines, processing equipment, which provides the most powerful guarantee for high quality products. Cable Tray Quality Traceability System Maintained In order to serve high quality products, it is essential to test the manufactured products before delivery. In this session, Our factory develops the most stringent testing procedures, and trains factory inspectors besides its already high level product inspection equipment.

Ordering Code

Specification

B1

H1

L

PHQ-T-1A

50

50

3000

100

50/100

200

 

300

400

500

600

800

1000

1200

test

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours